Service

Construction stakeout

We take your project coordinates to the ground, so foundations, roads and plots end up where the plans say.

Ask about stakeout

Stakeout plan with contour lines and project elements over an estate

What it involves

What it is and when it makes sense

Stakeout transfers the points defined in a plan or digital model to the real terrain. It is used before starting a project and during it, to verify positions and levels.

Before going on site we review the plans and coordinates and check which part of the work needs ground measurement and which relies on aerial data.

It is used for

  • Start of works and marking of axes
  • Verification of positions and levels
  • Subdivisions and roads
  • Support for site management

What you receive

Deliverables

01 Points set out on the ground
According to the commission.
02 Stakeout report
Coordinates, deviations and required adjustments.

Examples

What the result looks like

Stakeout plan with contour lines and project elements over an estate
Stakeout plan over contour lines
Plan of axes and stakeout points
Axes and points to set out

Examples of Air Mapping work. Locations and clients are not published.

Process

How we work

  1. Paso 1

    Preliminary analysis

    We review plans and coordinates and define what is set out.

  2. Paso 2

    Preparation

    We fix the reference system and the starting points.

  3. Paso 3

    Stakeout in the field

    Measurement and marking of the points on the ground.

  4. Paso 4

    Delivery

    Report with the data and any adjustments required.

To quote

What we need from you

  • Project plans or files (DWG, DXF, PDF)
  • List of elements to set out
  • Project coordinate system
  • Start date of the works

Honestly

What affects the result

  • Stakeout depends on the quality of the reference project.
  • Some elements require direct measurement on the ground.

Questions

Frequently asked questions

What is point stakeout and when is it needed?

It consists of transferring the coordinates of a project from a plan or digital model to the real terrain. It is needed when building houses, roads or other infrastructure so they are built where the project says.

What data do I need to provide?

The project plans in digital format and the coordinate system used.

Keep exploring

Related services

Tell us about your project

Tell us the location, the approximate area and what you need to obtain.

Ask about stakeout